Свежая информация о стройке в районе Джумейра, Дубай, ОАЭ

 

 

Hotel Name

From Date

To Date

Distance from construction site

Reasons

Noise

Working Hours

Implements

Miscellaneous

Le Royal Meridien Beach Resort&Spa Dubai

01/01/2006

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Medium

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Al Raha Beach Hotel Abu Dhabi

15/04/2007

31/12/2008

00 meter

AL RAHA DEVELOPMENT PROJECT – CONSTRUCTION ON THE RIGHT SIDE OF THE HOTEL. COMPLETION DATE IS STILL TBA.

LowMedium

Full Day

 

AL RAHA DEVELOPMENT PROJECT – CONSTRUCTION ON THE RIGHT SIDE OF THE HOTEL. COMPLETION DATE IS STILL TBA. Construction Site can be seen from the right inside-after the Al Raha Mall. From the left inside-Villas/Marina and front side,no construction at all. No noise in the rooms either.

Dubai Marine Beach Resort & Spa

01/01/2006

31/12/2008

00 meter

CONSTRUCTION OF WAVE-BREAKER.

 

 

 

CONSTRUCTION OF WAVE-BREAKER ON THE PUBLIC BEACH. COMPLETAIION DATE IS TBA.

Jumeirah Beach Club

11/01/2007

31/12/2008

00 meter

HOTEL IS COMPLETELY CLOSED DOWN FOR REDEVELOPMENT AND INCREASE IF SUITES INVENTORY.

High

 

 

HOTEL IS COMPLETELY CLOSED DOWN.

Hilton Ras Al Khaimah Hotel

15/03/2007

31/12/2008

00 meter

CONSTRUCTION OF LOW RISE SHOPPING MALL BEHIND THE HOTEL (200 - 300 METERS).

Medium

 

 

CONSTRUCTION OF LOW RISE SHOPPING MALL BEHIND THE HOTEL (200 - 300 METERS).

Royal Mirage Hotel The Palace

01/01/2007

01/12/2009

00 meter

CONSTRUCTION OF PALM ISLAND.

Low

 

 

CONSTRUCTION OF PALM ISLAND.

Sheraton Jumeirah Beach Dubai

01/01/2006

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT.

 

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Hilton Dubai Jumeirah

01/01/2006

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Medium

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT.

The Ritz-Carlton Dubai

01/01/2007

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Medium

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT.

 

01/01/2007

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Medium

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT.

 

01/01/2007

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Medium

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT.

Habtoor Grand Resort & Spa Dubai

01/01/2006

31/12/2009

00 meter

THE JUMEIRAH BEACH RESIDENCE PROJECT AND CONSTRUCTION ON THE RIGHT SIDE OF THE BEACH-WORK ON THE WAVE BREAKER.

 

 

 

THE JUMEIRAH BEACH RESIDENCE PROJECT AND CONSTRUCTION ON THE RIGHT SIDE OF THE BEACH-WORK ON THE WAVE BREAKER.

Millennium Airport Hotel Dubai

30/08/2007

31/07/2009

00 meter

Swimming Pool under renovation.

MediumHigh

Full Day

 

Please be advised that our Swimming Pool will no longer be available due to the hotel expansion project which is estimated to be finished by July 2009, with latest state of art recreation facilities.

Jebel Ali Hotel & Golf Resort

01/01/2006

31/12/2009

00 meter

1. CONSTRUCTION OF PALM ISLAND. EXPECTED COMPLETION DATE TBA. 2. LAND PROFILING WORK ON THE WATER-FRONT DEVELOPMENT-EXPECTED COMPLETION DATE IS TBA.

Low

 

 

LOW LEVEL NOISE AT BEACH AREA.

Sheraton Jumeirah Beach Dubai

01/09/2008

07/09/2008

00 meter

Swimming Pool under maintenance.

 

 

 

Hotel's Swimming Pool will be under maintenance from the 1st until 7th of September 2008. The Swimming Pool will be closed during this period. Thereafter, the pool area will be open as normal; however, the beach area will be operating normally.

Habtoor Grand Resort & Spa Dubai

02/09/2007

31/12/2008

00 meter

 

 

 

 

La Pampa Restaurant is closed until further notice.

Oasis Beach Hotel Dubai

15/06/2008

31/12/2008

00 meter

Complete redevelopment of Oasis Beach Hotel.

 

 

 

Hotel will be completely shut down from 1st Sep 2008 onwards; until further information. Following our earlier message regarding the hotel closure and complete redevelopment of the site. We have been liaising closely with the developers of the new project and while we are reasonably sure that the status quo of what has been communicated to you thus far will remain, there are a few bits of information which have not been confirmed to us in writing. As such, we take the liberty to share the following precautionary measures we will implement in the interim. An important part of the details we await confirmation on concerns the beach access and the period required for vacating the hotel premises and at which point this would take effect: 1) While we have every reason to believe that 1st September 2008 is still the date for the final check-out from the Oasis Beach Hotel, we have decided as a precautionary measure to stop sale Oasis Beach Hotel in July and August until we receive further information. At this point in time we do not feel it is necessary to inform your clients who have confirmed bookings during this period as an update on this stop sale will be advised by 1st April 2008. 2) We are also fairly certain and have received a reasonable confirmation from the developers that there will be a beach for Oasis Beach Tower guests once the Oasis Beach Hotel closes. The challenge unfortunately is that we are still awaiting details from the developer in terms of the exact access which will be provided to the beach area, along with the exact facilities which will be available on the beach. Subsequently, we have taken the decision to stop sale Oasis Beach Tower from 1st July 2008 onwards as a precautionary measure for the time being. Again, we do not feel there is a need to inform your clients at this point as an update will be provided by 1st April 2008.

Mina Salam, Madinat Jumeirah

14/03/2008

30/09/2008

00 meter

Closure of Trilogy Night Club.

 

 

 

As of 24th February 2008, Trilogy nightclub at Souk Madinat Jumeirah is closed for redevelopment. We are currently looking into different options for this unique venue, and we will be happy to share these with you in due course. Whilst Trilogy has been an integral part of the Souk Madinat Jumeirah experience, we are confident that there is still an unparalleled variety of eating and drinking establishments available, many of which offer music and live entertainment.

Towers Rotana Hotel Dubai

14/09/2008

20/09/2008

00 meter

Annual swimming pool maintenance

 

Full Day

 

Towers Rotana will be undergoing the annual swimming pool maintenance. It will take place from 14 -20 September 2008. As an alternative the hotel will use the Al Murooj Rotana Hotel & Villa Rotana swimming pool otherwise if the pool of both hotels is not available, the hotel will provide complimentary usage of Dubai Marine for all our in house guests with transfers.

The Harbour Hotel & Residence Dubai

08/11/2007

08/12/2008

00 meter

UPDATED STATUS ON THE FULL SERVICES AVAILABLE

Low

Full Day

 

Hotel's unique restaurant "Counter Culture" offering a New York style deli and bakery is in operation. Emirates Marina's signature restaurant, the stunning Observatory located on the 52nd floor will open at a later date. Timeless Spa, Gym and Spa level Azur restaurant is in its final phase and awaiting completion. Please note that Timeless Spa therapists are available from opening in a temporarily converted suite, offering a wide range of treatments. Guests will also have the opportunity to take advantage of the private beach and pool access offered at Le Royal Meridien. These facilities can be accessed via convenient shuttle bus service to the location. Please note that there will be only light contractor work in progress and disruption will be kept to a minimum. As part of Emirates Hotels & Resorts development strategy we will undertake a name change for the property to be called "The Harbour Hotel & Residence". This process will take place over the coming months. All brochure and promotional material will be changed in due course and we appreciate your support in this.

Hilton Abu Dhabi

06/12/2007

31/12/2009

00 meter

Shopping mall and a residential building is being constructed next to the hotel. Completion date is still TBA.

MediumHigh

Full DayAt Night

 

We would like to update you on the project that is underway in the vicinity of the hotel. As part of Abu Dhabi's ongoing development, a shopping mall and a residential building is being constructed next to the hotel. The development is in its initial stage, and is taking place to the right of the hotel on the Corniche Road. The site is visible from our rooms on one side of the hotel. The work is carried out from 6am to 8pm daily and there is the obvious noise disturbance for only that part of the hotel. We would like to stress that the work does not affect any of services, facilities or rooms in the rest of the hotel. Please note that while hotel tries not to allocate these rooms to our leisure guests sometimes there may be exceptions, especially when the hotel is running at full capacity. It is also our constant endeavour to ensure that the guests inconvenience is at the bare minimum. May we also stress once again the importance of informing every guest at the time of booking with us as to the extent of the construction and the necessity of putting this in writing on your confirmation. This will ensure that we are all being proactive in our communication to guests, and that guest satisfaction is not affected during their stay.

Shangri-La Hotel,Qaryat Al Beri AbuDhabi

03/01/2008

30/11/2008

300 meter

Latest update about the hotel.

LowMedium

Half DayFull Day

 

Please find below the latest update about the hotel. Out of 214 inventory 213 rooms are now on-line within the hotel section. All food and beverage outlets are also fully operational, further to this guests can also enjoy two of hotel's five beaches and two of five swimming pools. CHI, The Spa at Shangri-La, is open since the beginning of November 2007. As previously mentioned, the Shangri-La Residences (studios and apartments) will also be finalised soon and are expected to soft-open in early 2008. Outside of the hotel, construction has commenced approximately 1 kilometre away on the other side of the sea. There is some piling working currently being conducted and occasional noise may come across to the property. Additional to this, there is a restaurant development approximately 300 yards away from the hotel's South wing with occasional noise being heard during daylight hours and is expected to continue till the end of November 2008. Although there is work being conducted, hotel has erected hoarding on strategic locations to minimise any disturbances which guests may experience. Currently the guests are enjoying the facilities and hotel endeavor to maintain this. However, we ask you to pass this message to your front line teams, your business partners and your guests when making a reservation at the hotel.

Intercontinental Hotel Abu Dhabi

07/01/2008

31/10/2008

00 meter

Remodeling of Lebanese Restaurant

LowMedium

 

 

Updated on 25.08.08 --------------------------------- Please note that the opening of the Yacht Club restaurant is delayed until October 2008. Your guest will not experience noise or visual disturbance in the guestrooms, around the beach and pool area. The works taking place at the Yacht Club are carried out between 08:00 hrs until 17:00 hrs and we will do our best to ensure minimum disturbance. Updated on 05.04.2008. --------------------------------------- Further to our communication of 7 January 2008, please note that the opening of the Yacht Club restaurant is delayed until July 2008. Your guest will not experience noise or visual disturbance in the guestrooms, around the beach and pool area. The works taking place at the Yacht Club are carried out between 08:00 hrs until 17:00 hrs and we will do our best to ensure minimum disturbance. xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx 07.01.2008 ------------------ Please note that old Lebanese restaurant is in a process of remodeling to be opened on 1st of April 2008 as the Yacht Club restaurant. Guests may experience some occasional noise and visual disturbance during the day in open areas although a total exclusion of noisy works is in place between the hours of 11:00 - 15:00 to ensure that guests are not disturbed during peak periods.

Radisson SAS Dubai Deira Creek

20/09/2008

27/09/2008

00 meter

Swimming Pool maintenance

 

 

 

Hotel's swimming pool will be closed for yearly maintenance from 20th - 27th September 2008 (both days inclusive). As an alternative, guests will be able to use the swimming pool at the Sheraton Dubai Creek Hotel and Towers, located at a 100 meters distance from the hotel at free of cost.

Ajman Kempinski Hotel & Resort

26/08/2008

30/09/2008

00 meter

Renovation of Hotel's Lobby

 

 

 

We are currently upgrading our lobby for a fresher and authentic look. All outlets are in operation. The works are scheduled to be finished by end of September.

Oasis Beach Tower Dubai

12/04/2008

31/12/2010

00 meter

Construction sites proximate to the hotel.

 

 

 

Tour Operator shall inform guests that there are construction sites proximate to the Oasis Beach Tower & audio & visual disturbances are to be expected.

Intercontinental Hotel Abu Dhabi

23/08/2008

04/10/2008

00 meter

Kitchen renovation

 

 

 

This is to inform you that our Fishmarket restaurant will be closed for a major kitchen upgrade from August 23rd 2008. It will be reopen directly after Ramadan October 4th 2008.

Jebel Ali Hotel Palm Tree Court&Spa

01/06/2008

31/12/2009

00 meter

Expansion of Hotel Updated on 21.02.08 :We have great pleasure to inform you that we will enhance and expand the hotel with a luxury extension. Within the next few weeks we will commence with development of 76 new luxury units at the Palm Tree Court & Spa which will include a selection of junior suites in addition to some very special one bedroom and two bedroom suites as part of the new inventory. The new project will be located on the sand stretch on the western border of the resort (Abu Dhabi / Dubai Waterfront side of Palm Tree Court & Spa). Hoarding will be placed to screen off the area which will be affected in future however the first phase of the project will comprise the fairly academic process of soil testing which will not cause any disturbance to our guests in the resort. Once physical construction of the new wing commences in the next few weeks, all access to the site will be from a separate entrance outside the resort and work will take place during daylight hours only from 10am to 5.30pm. While a firm date for the physical construction has not been finalised, it is expected to commence around early April. While we recommend advising your clients of the current preparations, we at present do not anticipate any significant impact to the enjoyment of our guests during their stay at the Palm Tree Court & Spa, however we will closely monitor the situation and advise you accordingly should this change. We will continue to update you on the development of this exciting addition to the Palm Tree Court & Spa and should you require any additional details, please don't hesitate to let us know.

 

 

 

Updated on 15.06.08 : Further to our earlier message pertaining to the luxury extension of the Palm Tree Court & Spa, it is our great pleasure to provide you with an update on the work schedule. We are pleased to inform you that physical construction is likely to commence on 1 July and not June as earlier indicated, leaving the entire month of June free from onsite development activities for the extension. We will continue to update you on the development of this exciting addition to the Palm Tree Court & Spa and should you require any additional details, please don’t hesitate to let us know. ------------------------------------------------------------------- Updated on 27.03.07 : Further to our earlier message pertaining to the luxury extension of the Palm Tree Court & Spa, it is our great pleasure to provide you with an update on the work schedule. The soil testing has now been completed and we are pleased to inform you that physical construction is likely to commence on 1st June and not April as earlier indicated, leaving the entire April and May free from onsite development activities for the extension.   We will continue to update you on the development of this exciting addition to the Palm Tree Court & Spa and should you require any additional details, please don’t hesitate to let us know.

Regent Beach Resort Dubai

13/03/2008

31/12/2008

00 meter

Closure of Hotel from 9th Mayl 2008 onwards.

 

 

 

updated on 10.04.09 -------------------------------- We wish to inform you that Regent Beach Resort is still in operation until 09/05/2008. In the mean time I wish to inform you of the latest good news related to the new Regent Beach Resort....Jumeirah. Regent Beach Resort will be relocated and shall open in the same area on the Beach near by at Jumeirah 1 same road just 20 Meters far from the present location, we have received the site and the developments are in progress , the estimated opening date will be in September 2008 if not earlier. We will update you as soon as we get closer to the date in order to continue your support to us same as before. ******************************************************************************************************** 13.03.2008 -------------------- This note is to advise you that due to the on going developments in Dubai and particularly in Jumeirah 1, we have been advised by Dubai Government that there will be an extension of a CANAL through the current location of Regent Beach Resort and it has to be demolished. Therefore, we would like to notify you that Regent Beach Resort will be closed down on 30 / 04 / 2008 and it will be relocated in the same area nearby. Hence we kindly request you to update your clients accordingly, stop sale of Regent Beach Resort as of 30 / 04 / 2008 and consider all the on hand contracts are cancelled and it will be re-evaluated when we open the new hotel. On the other hand we will keep you updated of the development and the progress of the New Regent Beach Resort which will be a fantastic state of the art.

Le Meridien Al Aqah Beach Resort

14/03/2008

30/09/2008

00 meter

Improvement of Toilets & Shower works, Landscaping, Beach Facilities, Upgrading of Beach Umbrellas, Diving Centre & Sports Bar. Update received on 29/04/2008: Please find hereunder the updated schedule of works; - The current toilets and shower works are due to be completed by 31 May. - The beach renovation consists in remaking the landscaping and upgrading the existing umbrellas. The works will be done in two phases: - Phase one started as of 10 April and is carried on in the area of Diving Center. The works are due to be completed by 18 May (dates may vary with one or two days either way) - Phase two will start as of 19 May and are due to be completed by 19 June (dates may vary with one or two days either way) Most of the work will be done outside, in the contracted company’s workshop and only the installation will be done on site. The installation will probably cause intermittent disturbance, although no major inconvenience. Update received on 26/03/2008: With reference to the e-mail we have sent you on 13 March, regarding the renovation works on our beach, I would like to give you more details on the length of the works and the impact they will have on our mutual customers. Please find hereunder the schedule of works: - The current toilets and shower works are due to be completed by 20 April. - The beach renovation will be done in two phases: · Phase one will start as of 10 April and will be carried on in the area of Diving Center and Sports Bar. The works are due to be completed by 15 May (dates may vary with one or two days either way) · Phase two will start at the beginning of May and consist in remaking the landscaping and upgrading the existing umbrellas on the left side of the beach (1 - 15 May) and on the right side of the beach (15 - 31 May) (dates may vary with one or two days either way) As mentioned previously, please note that most of the work will be done outside, in the contracted company’s workshop and only the installation will be done on site. The installation will probably cause intermittent disturbance, although no major inconvenience, thus we are seeking your patience and support during the development of these additional facilities. Update received on 13/03/2008 Hotel was affected by the Cyclone Gonu last year, which caused certain damages to lovely front beach. In order to further improve the facilities we are offering to our guests, we will are starting a project meant to upgrade the beach front to a higher standard, which should increase the guests’ satisfaction even more. We are going to remake the landscaping and do an upgrading of the beach umbrellas. To minimize the impact, we will complete the project gradually, on parts of the beach. Most of the work will be done outside, in the contracted company’s workshop and only the installation will be done on site. As the installation will most probably cause intermittent disturbance, although no major inconvenience, we are seeking your patience and support during the development of these additional facilities.

 

 

 

Updated on 29.07.08 --------------------------------- We thank you for your patience on the delay of our update concerning the renovation works on our beach. Phase I is now completed in the area near the Diving Center; regretfully, the contractors were unable to meet the deadline to complete Phase II which is the landscaping and upgrading of the existing umbrellas; which is now expected to be completed by end-September 2008. As mentioned in our earlier email, the pending works will cause sporadic disturbance although no major inconvenience to our hotel guests. We, nevertheless, extend our sincere apologies for any inconvenience that these works might have caused you and your clients. Updated on 17.06.08: Latest updates on the length of the works. 1. The current toilets and shower works are due to be completed by 10 July. 2. The beach renovation consists in remaking the landscaping and upgrading the existing umbrellas. The works will be done in two phases: Phase one started as of 10 April and is carried on in the area of Diving Center. The works are due to be completed by 20 June (dates may vary with one or two days – either way) Phase two is due to be completed by 20 July (dates may vary with one or two days-either way) As mentioned previously, please note that most of the work will be done outside, in the contracted company’s workshop and only the installation will be done on site. The installation will probably cause intermittent disturbance, although no major inconvenience, thus we are seeking your patience and support during the development of these additional facilities.

Al Qasr, Madinat Jumeirah

15/03/2008

30/09/2008

00 meter

Closure of Trilogy Night Club.

 

 

 

As of 24th February 2008, Trilogy nightclub at Souk Madinat Jumeirah is closed for redevelopment. We are currently looking into different options for this unique venue, and we will be happy to share these with you in due course. Whilst Trilogy has been an integral part of the Souk Madinat Jumeirah experience, we are confident that there is still an unparalleled variety of eating and drinking establishments available, many of which offer music and live entertainment.

Dar Al Masyaf, Madinat Jumeirah

14/03/2008

30/09/2008

00 meter

Closure of Trilogy Night Club.

 

 

 

As of 24th February 2008, Trilogy nightclub at Souk Madinat Jumeirah is closed for redevelopment. We are currently looking into different options for this unique venue, and we will be happy to share these with you in due course. Whilst Trilogy has been an integral part of the Souk Madinat Jumeirah experience, we are confident that there is still an unparalleled variety of eating and drinking establishments available, many of which offer music and live entertainment.

The Montgomerie Hotel Dubai

01/06/2008

30/09/2008

00 meter

Major construction project at The Montgomerie, Starting 1st June 2008 until 30th September 2008, the front 9 holes of the golf course will be closed due to the regrassing of the greens. During these four months players will still be able to play 18 holes as they will play twice on the back 9 holes to complete the full round.

 

 

 

The greens at The Montgomerie, Dubai continue to be a challenge to maintain during the summer months due to the turf grass species currently being used and the existing soil conditions. In addition our extreme summer climatic conditions coupled with poor quality irrigation water also have deteriorated the greens year after year prompting us to implement a greens rebuild construction program which will commence on June 1st 2008 for the front 9 greens. This will involve closing the front 9 holes of the golf course for a period of 4 months from June 1st to September 30th to allow us to remove the existing greens turf and top 6 inches of high organic contaminated soil. A mix of blended silica sand and peat moss will be placed back into the greens accompanied by compacting and shaping to return the greens back to their original contours. Research into an improved turf grass species has resulted with TifEagle Ultrdwarf Bermuda being the most tolerant turf species for this region. The TifEagle Ultradwarf Bermuda has stood the test of time as it has been used on many other golf courses in this region. This rebuild program will again be mirrored for the back 9 greens in the summer of 2009 which will see the championship course greens fully converted to produce superior quality putting surfaces for the future. During this construction project, 9 holes will remain open for play so that you may enjoy playing twice for 18 holes.

The Palace- The Old Town Dubai

26/03/2008

31/12/2010

00 meter

Construction Update.

 

 

 

As you surely know, Dubai is in a state of continuous expansion and is experiencing a tremendous momentum of development throughout the city. Our Hotel is located on The Old Town Island in Downtown Burj Dubai. This area is currently being developed and is under construction, including projects such as The Dubai Mall (the world's largest mall), Burj Dubai (the world's tallest tower) and several residential areas. With regards to the construction, there is a certain amount of building work in the vicinity, however, normally once indoors, there is no disturbance as all our windows are soundproofed and the walls are thick. All these development projects are managed by local contractors and we do not have exact details on when the works are expected to be finished. Please note that we are not undergoing any physical changes to our property and that we do not have any construction works going on at the Hotel itself. We trust this information is extensive and up to your expectations and we most certainly remain at your disposal for any further detail and assistance you may require.

Sheraton Deira Hotel Dubai

10/05/2008

31/10/2008

00 meter