Hotel Name |
From Date |
To Date |
Distance from construction site |
Reasons |
Noise |
Working Hours |
Implements |
Miscellaneous |
|
Le
Royal Meridien Beach Resort&Spa Dubai |
01/01/2006 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
Medium |
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
Al
Raha Beach Hotel Abu Dhabi |
15/04/2007 |
31/12/2008 |
00 meter |
AL
RAHA DEVELOPMENT PROJECT – CONSTRUCTION ON THE RIGHT SIDE OF THE
HOTEL.
COMPLETION DATE IS STILL TBA. |
LowMedium |
Full Day |
|
AL
RAHA DEVELOPMENT PROJECT – CONSTRUCTION ON THE RIGHT SIDE OF THE
HOTEL. COMPLETION DATE IS STILL TBA. Construction Site can be
seen from the right inside-after the Al Raha Mall. From the left
inside-Villas/Marina and front side,no construction at all.
No noise in the rooms either. |
|
Dubai
Marine Beach Resort & Spa |
01/01/2006 |
31/12/2008 |
00 meter |
CONSTRUCTION OF WAVE-BREAKER. |
|
|
|
CONSTRUCTION OF WAVE-BREAKER ON THE PUBLIC BEACH.
COMPLETAIION DATE IS
TBA. |
|
Jumeirah Beach Club |
11/01/2007 |
31/12/2008 |
00 meter |
HOTEL
IS COMPLETELY CLOSED DOWN FOR REDEVELOPMENT AND INCREASE IF
SUITES INVENTORY. |
High |
|
|
HOTEL
IS COMPLETELY CLOSED DOWN. |
|
Hilton Ras Al Khaimah Hotel |
15/03/2007 |
31/12/2008 |
00 meter |
CONSTRUCTION OF LOW RISE SHOPPING MALL BEHIND THE HOTEL (200 -
300 METERS). |
Medium |
|
|
CONSTRUCTION OF LOW RISE SHOPPING MALL BEHIND THE HOTEL (200 -
300 METERS). |
|
Royal
Mirage Hotel The Palace |
01/01/2007 |
01/12/2009 |
00 meter |
CONSTRUCTION OF PALM ISLAND. |
Low |
|
|
CONSTRUCTION OF PALM ISLAND. |
|
Sheraton Jumeirah Beach Dubai |
01/01/2006 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
Hilton Dubai Jumeirah |
01/01/2006 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
Medium |
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
The Ritz-Carlton Dubai |
01/01/2007 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
Medium |
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
|
01/01/2007 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
Medium |
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
|
01/01/2007 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
Medium |
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT. |
|
Habtoor Grand Resort & Spa Dubai |
01/01/2006 |
31/12/2009 |
00 meter |
THE
JUMEIRAH BEACH RESIDENCE PROJECT AND CONSTRUCTION ON THE RIGHT
SIDE OF THE BEACH-WORK ON THE WAVE BREAKER. |
|
|
|
THE
JUMEIRAH BEACH RESIDENCE PROJECT AND CONSTRUCTION ON THE RIGHT
SIDE OF THE BEACH-WORK ON THE WAVE BREAKER. |
|
Millennium Airport Hotel Dubai |
30/08/2007 |
31/07/2009 |
00 meter |
Swimming Pool under renovation. |
MediumHigh |
Full Day |
|
Please be advised that our Swimming Pool will no longer be
available due to the hotel expansion project which is estimated
to be finished by July 2009, with latest state of art recreation
facilities. |
|
Jebel
Ali Hotel & Golf Resort |
01/01/2006 |
31/12/2009 |
00 meter |
1.
CONSTRUCTION OF PALM ISLAND. EXPECTED COMPLETION DATE TBA. 2.
LAND PROFILING WORK ON THE WATER-FRONT DEVELOPMENT-EXPECTED
COMPLETION DATE IS TBA. |
Low |
|
|
LOW
LEVEL NOISE AT BEACH AREA. |
|
Sheraton Jumeirah Beach Dubai |
01/09/2008 |
07/09/2008 |
00 meter |
Swimming Pool under maintenance. |
|
|
|
Hotel's Swimming Pool will be under maintenance from the 1st
until 7th of September 2008. The Swimming Pool will be closed
during this period. Thereafter, the pool area will be open as
normal; however, the beach area will be operating normally.
|
|
Habtoor Grand Resort & Spa Dubai |
02/09/2007 |
31/12/2008 |
00 meter |
|
|
|
|
La
Pampa Restaurant is closed until further notice. |
|
Oasis Beach Hotel Dubai |
15/06/2008 |
31/12/2008 |
00 meter |
Complete redevelopment of Oasis Beach Hotel. |
|
|
|
Hotel
will be completely shut down from 1st Sep 2008 onwards; until
further information. Following our earlier message regarding the
hotel closure and complete redevelopment of the site. We have
been liaising closely with the developers of the new project and
while we are reasonably sure that the status quo of what has
been communicated to you thus far will remain, there are a few
bits of information which have not been confirmed to us in
writing. As such, we take the liberty to share the following
precautionary measures we will implement in the interim. An
important part of the details we await confirmation on concerns
the beach access and the period required for vacating the hotel
premises and at which point this would take effect: 1) While we
have every reason to believe that 1st September 2008 is still
the date for the final check-out from the Oasis Beach Hotel, we
have decided as a precautionary measure to stop sale Oasis Beach
Hotel in July and August until we receive further information.
At this point in time we do not feel it is necessary to inform
your clients who have confirmed bookings during this period as
an update on this stop sale will be advised by 1st April 2008.
2) We are also fairly certain and have received a reasonable
confirmation from the developers that there will be a beach for
Oasis Beach Tower guests once the Oasis Beach Hotel closes. The
challenge unfortunately is that we are still awaiting details
from the developer in terms of the exact access which will be
provided to the beach area, along with the exact facilities
which will be available on the beach. Subsequently, we have
taken the decision to stop sale Oasis Beach Tower from 1st July
2008 onwards as a precautionary measure for the time being.
Again, we do not feel there is a need to inform your clients at
this point as an update will be provided by 1st April 2008.
|
|
Mina Salam, Madinat Jumeirah |
14/03/2008 |
30/09/2008 |
00 meter |
Closure of Trilogy Night Club. |
|
|
|
As of
24th February 2008, Trilogy nightclub at Souk Madinat Jumeirah
is closed for redevelopment. We are currently looking into
different options for this unique venue, and we will be happy to
share these with you in due course. Whilst Trilogy has been an
integral part of the Souk Madinat Jumeirah experience, we are
confident that there is still an unparalleled variety of eating
and drinking establishments available, many of which offer music
and live entertainment. |
|
Towers Rotana Hotel Dubai |
14/09/2008 |
20/09/2008 |
00 meter |
Annual swimming pool maintenance |
|
Full Day |
|
Towers Rotana will be undergoing the annual swimming pool
maintenance. It will take place from 14 -20 September 2008. As
an alternative the hotel will use the Al Murooj Rotana Hotel &
Villa Rotana swimming pool otherwise if the pool of both hotels
is not available, the hotel will provide complimentary usage of
Dubai Marine for all our in house guests with transfers. |
|
The
Harbour Hotel & Residence Dubai |
08/11/2007 |
08/12/2008 |
00 meter |
UPDATED STATUS ON THE FULL SERVICES AVAILABLE |
Low |
Full Day |
|
Hotel's unique restaurant "Counter Culture" offering a New York
style deli and bakery is in operation. Emirates Marina's
signature restaurant, the stunning Observatory located on the
52nd floor will open at a later date. Timeless Spa, Gym and Spa
level Azur restaurant is in its final phase and awaiting
completion. Please note that Timeless Spa therapists are
available from opening in a temporarily converted suite,
offering a wide range of treatments. Guests will also have the
opportunity to take advantage of the private beach and pool
access offered at Le Royal Meridien. These facilities can be
accessed via convenient shuttle bus service to the location.
Please note that there will be only light contractor work in
progress and disruption will be kept to a minimum. As part of
Emirates Hotels & Resorts development strategy we will undertake
a name change for the property to be called "The Harbour Hotel &
Residence". This process will take place over the coming months.
All brochure and promotional material will be changed in due
course and we appreciate your support in this. |
|
Hilton Abu Dhabi |
06/12/2007 |
31/12/2009 |
00 meter |
Shopping mall and a residential building is being constructed
next to the hotel.
Completion date is still TBA. |
MediumHigh |
Full DayAt Night |
|
We
would like to update you on the project that is underway in the
vicinity of the hotel. As part of Abu Dhabi's ongoing
development, a shopping mall and a residential building is being
constructed next to the hotel. The development is in its initial
stage, and is taking place to the right of the hotel on the
Corniche Road. The site is visible from our rooms on one side of
the hotel. The work is carried out from 6am to 8pm daily and
there is the obvious noise disturbance for only that part of the
hotel. We would like to stress that the work does not affect any
of services, facilities or rooms in the rest of the hotel.
Please note that while hotel tries not to allocate these rooms
to our leisure guests sometimes there may be exceptions,
especially when the hotel is running at full capacity. It is
also our constant endeavour to ensure that the guests
inconvenience is at the bare minimum. May we also stress once
again the importance of informing every guest at the time of
booking with us as to the extent of the construction and the
necessity of putting this in writing on your confirmation. This
will ensure that we are all being proactive in our communication
to guests, and that guest satisfaction is not affected during
their stay. |
|
Shangri-La Hotel,Qaryat Al Beri AbuDhabi |
03/01/2008 |
30/11/2008 |
300 meter |
Latest update about the hotel. |
LowMedium |
Half DayFull Day |
|
Please find below the latest update about the hotel. Out of 214
inventory 213 rooms are now on-line within the hotel section.
All food and beverage outlets are also fully operational,
further to this guests can also enjoy two of hotel's five
beaches and two of five swimming pools. CHI, The Spa at
Shangri-La, is open since the beginning of November 2007. As
previously mentioned, the Shangri-La Residences (studios and
apartments) will also be finalised soon and are expected to
soft-open in early 2008. Outside of the hotel, construction has
commenced approximately 1 kilometre away on the other side of
the sea. There is some piling working currently being conducted
and occasional noise may come across to the property. Additional
to this, there is a restaurant development approximately 300
yards away from the hotel's South wing with occasional noise
being heard during daylight hours and is expected to continue
till the end of November 2008. Although there is work being
conducted, hotel has erected hoarding on strategic locations to
minimise any disturbances which guests may experience. Currently
the guests are enjoying the facilities and hotel endeavor to
maintain this. However, we ask you to pass this message to your
front line teams, your business partners and your guests when
making a reservation at the hotel. |
|
Intercontinental Hotel Abu Dhabi |
07/01/2008 |
31/10/2008 |
00 meter |
Remodeling of Lebanese Restaurant |
LowMedium |
|
|
Updated on 25.08.08 --------------------------------- Please
note that the opening of the Yacht Club restaurant is delayed
until October 2008. Your guest will not experience noise or
visual disturbance in the guestrooms, around the beach and pool
area. The works taking place at the Yacht Club are carried out
between 08:00 hrs until 17:00 hrs and we will do our best to
ensure minimum disturbance. Updated on 05.04.2008.
--------------------------------------- Further to our
communication of 7 January 2008, please note that the opening of
the Yacht Club restaurant is delayed until July 2008. Your guest
will not experience noise or visual disturbance in the
guestrooms, around the beach and pool area. The works taking
place at the Yacht Club are carried out between 08:00 hrs until
17:00 hrs and we will do our best to ensure minimum disturbance.
xxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxxx
07.01.2008 ------------------ Please note that old Lebanese
restaurant is in a process of remodeling to be opened on 1st of
April 2008 as the Yacht Club restaurant. Guests may experience
some occasional noise and visual disturbance during the day in
open areas although a total exclusion of noisy works is in place
between the hours of 11:00 - 15:00 to ensure that guests are not
disturbed during peak periods. |
|
Radisson SAS Dubai Deira Creek |
20/09/2008 |
27/09/2008 |
00 meter |
Swimming Pool maintenance |
|
|
|
Hotel's swimming pool will be closed for yearly maintenance from
20th - 27th September 2008 (both days inclusive). As an
alternative, guests will be able to use the swimming pool at the
Sheraton Dubai Creek Hotel and Towers, located at a 100 meters
distance from the hotel at free of cost. |
|
Ajman Kempinski Hotel & Resort |
26/08/2008 |
30/09/2008 |
00 meter |
Renovation of Hotel's Lobby |
|
|
|
We
are currently upgrading our lobby for a fresher and authentic
look. All outlets are in operation. The works are scheduled to
be finished by end of September. |
|
Oasis Beach Tower Dubai |
12/04/2008 |
31/12/2010 |
00 meter |
Construction sites proximate to the hotel. |
|
|
|
Tour
Operator shall inform guests that there are construction sites
proximate to the Oasis Beach Tower & audio & visual disturbances
are to be expected. |
|
Intercontinental Hotel Abu Dhabi |
23/08/2008 |
04/10/2008 |
00 meter |
Kitchen renovation |
|
|
|
This
is to inform you that our Fishmarket restaurant will be closed
for a major kitchen upgrade from August 23rd 2008.
It will be reopen
directly after Ramadan October 4th 2008. |
|
Jebel
Ali Hotel Palm Tree Court&Spa |
01/06/2008 |
31/12/2009 |
00 meter |
Expansion of Hotel Updated on 21.02.08 :We have great pleasure
to inform you that we will enhance and expand the hotel with a
luxury extension. Within the next few weeks we will commence
with development of 76 new luxury units at the Palm Tree Court &
Spa which will include a selection of junior suites in addition
to some very special one bedroom and two bedroom suites as part
of the new inventory. The new project will be located on the
sand stretch on the western border of the resort (Abu Dhabi /
Dubai Waterfront side of Palm Tree Court & Spa). Hoarding will
be placed to screen off the area which will be affected in
future however the first phase of the project will comprise the
fairly academic process of soil testing which will not cause any
disturbance to our guests in the resort. Once physical
construction of the new wing commences in the next few weeks,
all access to the site will be from a separate entrance outside
the resort and work will take place during daylight hours only
from 10am to 5.30pm. While a firm date for the physical
construction has not been finalised, it is expected to commence
around early April. While we recommend advising your clients of
the current preparations, we at present do not anticipate any
significant impact to the enjoyment of our guests during their
stay at the Palm Tree Court & Spa, however we will closely
monitor the situation and advise you accordingly should this
change. We will continue to update you on the development of
this exciting addition to the Palm Tree Court & Spa and should
you require any additional details, please don't hesitate to let
us know. |
|
|
|
Updated on 15.06.08 : Further to our earlier message pertaining
to the luxury extension of the Palm Tree Court & Spa, it is our
great pleasure to provide you with an update on the work
schedule. We are pleased to inform you that physical
construction is likely to commence on 1 July and not June as
earlier indicated, leaving the entire month of June free from
onsite development activities for the extension. We will
continue to update you on the development of this exciting
addition to the Palm Tree Court & Spa and should you require any
additional details, please don’t hesitate to let us know.
-------------------------------------------------------------------
Updated on 27.03.07 : Further to our earlier message pertaining
to the luxury extension of the Palm Tree Court & Spa, it is our
great pleasure to provide you with an update on the work
schedule. The soil testing has now been completed and we are
pleased to inform you that physical construction is likely to
commence on 1st June and not April as earlier indicated, leaving
the entire April and May free from onsite development activities
for the extension. We will continue to update you on the
development of this exciting addition to the Palm Tree Court &
Spa and should you require any additional details, please don’t
hesitate to let us know. |
|
Regent Beach Resort Dubai |
13/03/2008 |
31/12/2008 |
00 meter |
Closure of Hotel from 9th Mayl 2008 onwards. |
|
|
|
updated on 10.04.09 -------------------------------- We wish to
inform you that Regent Beach Resort is still in operation until
09/05/2008. In the mean time I wish to inform you of the latest
good news related to the new Regent Beach Resort....Jumeirah.
Regent Beach Resort will be relocated and shall open in the same
area on the Beach near by at Jumeirah 1 same road just 20 Meters
far from the present location, we have received the site and the
developments are in progress , the estimated opening date will
be in September 2008 if not earlier. We will update you as soon
as we get closer to the date in order to continue your support
to us same as before.
********************************************************************************************************
13.03.2008 -------------------- This note is to advise you that
due to the on going developments in Dubai and particularly in
Jumeirah 1, we have been advised by Dubai Government that there
will be an extension of a CANAL through the current location of
Regent Beach Resort and it has to be demolished. Therefore, we
would like to notify you that Regent Beach Resort will be closed
down on 30 / 04 / 2008 and it will be relocated in the same area
nearby. Hence we kindly request you to update your clients
accordingly, stop sale of Regent Beach Resort as of 30 / 04 /
2008 and consider all the on hand contracts are cancelled and it
will be re-evaluated when we open the new hotel. On the other
hand we will keep you updated of the development and the
progress of the New Regent Beach Resort which will be a
fantastic state of the art. |
|
Le
Meridien Al Aqah Beach Resort |
14/03/2008 |
30/09/2008 |
00 meter |
Improvement of Toilets & Shower works, Landscaping, Beach
Facilities, Upgrading of Beach Umbrellas, Diving Centre & Sports
Bar. Update received on 29/04/2008: Please find hereunder the
updated schedule of works; - The current toilets and shower
works are due to be completed by 31 May. - The beach renovation
consists in remaking the landscaping and upgrading the existing
umbrellas. The works will be done in two phases: - Phase one
started as of 10 April and is carried on in the area of Diving
Center. The works are due to be completed by 18 May (dates may
vary with one or two days either way) - Phase two will start as
of 19 May and are due to be completed by 19 June (dates may vary
with one or two days either way) Most of the work will be done
outside, in the contracted company’s workshop and only the
installation will be done on site. The installation will
probably cause intermittent disturbance, although no major
inconvenience. Update received on 26/03/2008: With reference to
the e-mail we have sent you on 13 March, regarding the
renovation works on our beach, I would like to give you more
details on the length of the works and the impact they will have
on our mutual customers. Please find hereunder the schedule of
works: - The current toilets and shower works are due to be
completed by 20 April. - The beach renovation will be done in
two phases: · Phase one will start as of 10 April and will be
carried on in the area of Diving Center and Sports Bar. The
works are due to be completed by 15 May (dates may vary with one
or two days either way) · Phase two will start at the beginning
of May and consist in remaking the landscaping and upgrading the
existing umbrellas on the left side of the beach (1 - 15 May)
and on the right side of the beach (15 - 31 May) (dates may vary
with one or two days either way) As mentioned previously, please
note that most of the work will be done outside, in the
contracted company’s workshop and only the installation will be
done on site. The installation will probably cause intermittent
disturbance, although no major inconvenience, thus we are
seeking your patience and support during the development of
these additional facilities. Update received on 13/03/2008 Hotel
was affected by the Cyclone Gonu last year, which caused certain
damages to lovely front beach. In order to further improve the
facilities we are offering to our guests, we will are starting a
project meant to upgrade the beach front to a higher standard,
which should increase the guests’ satisfaction even more. We are
going to remake the landscaping and do an upgrading of the beach
umbrellas. To minimize the impact, we will complete the project
gradually, on parts of the beach. Most of the work will be done
outside, in the contracted company’s workshop and only the
installation will be done on site. As the installation will most
probably cause intermittent disturbance, although no major
inconvenience, we are seeking your patience and support during
the development of these additional facilities. |
|
|
|
Updated on 29.07.08 --------------------------------- We thank
you for your patience on the delay of our update concerning the
renovation works on our beach. Phase I is now completed in the
area near the Diving Center; regretfully, the contractors were
unable to meet the deadline to complete Phase II which is the
landscaping and upgrading of the existing umbrellas; which is
now expected to be completed by end-September 2008. As mentioned
in our earlier email, the pending works will cause sporadic
disturbance although no major inconvenience to our hotel guests.
We, nevertheless, extend our sincere apologies for any
inconvenience that these works might have caused you and your
clients. Updated on 17.06.08: Latest updates on the length of
the works. 1. The current toilets and shower works are due to be
completed by 10 July. 2. The beach renovation consists in
remaking the landscaping and upgrading the existing umbrellas.
The works will be done in two phases: Phase one started as of 10
April and is carried on in the area of Diving Center. The works
are due to be completed by 20 June (dates may vary with one or
two days – either way) Phase two is due to be completed by 20
July (dates may vary with one or two days-either way) As
mentioned previously, please note that most of the work will be
done outside, in the contracted company’s workshop and only the
installation will be done on site. The installation will
probably cause intermittent disturbance, although no major
inconvenience, thus we are seeking your patience and support
during the development of these additional facilities.
|
|
Al Qasr, Madinat Jumeirah |
15/03/2008 |
30/09/2008 |
00 meter |
Closure of Trilogy Night Club. |
|
|
|
As of
24th February 2008, Trilogy nightclub at Souk Madinat Jumeirah
is closed for redevelopment. We are currently looking into
different options for this unique venue, and we will be happy to
share these with you in due course. Whilst Trilogy has been an
integral part of the Souk Madinat Jumeirah experience, we are
confident that there is still an unparalleled variety of eating
and drinking establishments available, many of which offer music
and live entertainment. |
|
Dar
Al Masyaf, Madinat Jumeirah |
14/03/2008 |
30/09/2008 |
00 meter |
Closure of Trilogy Night Club. |
|
|
|
As of
24th February 2008, Trilogy nightclub at Souk Madinat Jumeirah
is closed for redevelopment. We are currently looking into
different options for this unique venue, and we will be happy to
share these with you in due course. Whilst Trilogy has been an
integral part of the Souk Madinat Jumeirah experience, we are
confident that there is still an unparalleled variety of eating
and drinking establishments available, many of which offer music
and live entertainment. |
|
The Montgomerie Hotel Dubai |
01/06/2008 |
30/09/2008 |
00 meter |
Major
construction project at The Montgomerie, Starting 1st June 2008
until 30th September 2008, the front 9 holes of the golf course
will be closed due to the regrassing of the greens. During these
four months players will still be able to play 18 holes as they
will play twice on the back 9 holes to complete the full round.
|
|
|
|
The
greens at The Montgomerie, Dubai continue to be a challenge to
maintain during the summer months due to the turf grass species
currently being used and the existing soil conditions. In
addition our extreme summer climatic conditions coupled with
poor quality irrigation water also have deteriorated the greens
year after year prompting us to implement a greens rebuild
construction program which will commence on June 1st 2008 for
the front 9 greens. This will involve closing the front 9 holes
of the golf course for a period of 4 months from June 1st to
September 30th to allow us to remove the existing greens turf
and top 6 inches of high organic contaminated soil. A mix of
blended silica sand and peat moss will be placed back into the
greens accompanied by compacting and shaping to return the
greens back to their original contours. Research into an
improved turf grass species has resulted with TifEagle Ultrdwarf
Bermuda being the most tolerant turf species for this region.
The TifEagle Ultradwarf Bermuda has stood the test of time as it
has been used on many other golf courses in this region. This
rebuild program will again be mirrored for the back 9 greens in
the summer of 2009 which will see the championship course greens
fully converted to produce superior quality putting surfaces for
the future. During this construction project, 9 holes will
remain open for play so that you may enjoy playing twice for 18
holes. |
|
The
Palace- The Old Town Dubai |
26/03/2008 |
31/12/2010 |
00 meter |
Construction Update. |
|
|
|
As
you surely know, Dubai is in a state of continuous expansion and
is experiencing a tremendous momentum of development throughout
the city. Our Hotel is located on The Old Town Island in
Downtown Burj Dubai. This area is currently being developed and
is under construction, including projects such as The Dubai Mall
(the world's largest mall), Burj Dubai (the world's tallest
tower) and several residential areas. With regards to the
construction, there is a certain amount of building work in the
vicinity, however, normally once indoors, there is no
disturbance as all our windows are soundproofed and the walls
are thick. All these development projects are managed by local
contractors and we do not have exact details on when the works
are expected to be finished. Please note that we are not
undergoing any physical changes to our property and that we do
not have any construction works going on at the Hotel itself. We
trust this information is extensive and up to your expectations
and we most certainly remain at your disposal for any further
detail and assistance you may require. |
|
Sheraton Deira Hotel Dubai |
10/05/2008 |
31/10/2008 |
00 meter |
|